GH-3型11米单管钢管避雷塔技术文档
Technical Documentation for GH-3 Type 11-Meter Single-Pipe Steel Lightning Rod Tower
一、产品概述
1. Product Overview

GH-3型避雷塔是依据国标图集 15D501(及早期99D501-1) 制造的标准 11米 自立式单管钢管避雷塔,属于GH系列11米高度段中 适配0.4/0.7 kN/m²风压、塔体进行重载加强的配置。塔体为单根锥形钢管,无拉索,塔体本身兼作引下线,外形简洁。
GH-3与GH-1/GH-2同属11米高度、JD-1基础体系,但在该组中承担 “重载/高风压适配” 角色。其塔体参考重量为 364 kg,对应 6mm壁厚 配置。在0.4 kN/m²常规风压场景下,GH-3以更高的结构冗余提供额外的安全裕度;在0.7 kN/m²高风压场景下,GH-3是该组中无需另行结构复核即可适配的优选配置。上口直径190 mm,底盘直径362 mm。底部采用 JD-1 独立基础,预埋螺栓 M24×8,土建开挖量极小。塔顶可配套主动预放电接闪装置及机械式雷电计数器。本型号适用于 楼顶、小型库房、泵房、通信基站及对结构冗余度有更高要求的常规防雷场景。
The GH-3 lightning protection tower is a standard 11-meter self-supporting single-pipe steel lightning tower manufactured in accordance with national standard atlas 15D501 (and earlier 99D501-1). It is the heavy-duty / high-wind-pressure adaptable configuration within the 11-meter height group of the GH series, for 0.4/0.7 kN/m² wind pressure. The tower body is a single tapered steel pipe without guy wires, and the tower body itself serves as the down conductor.
GH-3 shares the same 11-meter height and JD-1 foundation system with GH-1/GH-2, but assumes the “heavy-duty / high-wind-pressure adaptable” role within that group. Its reference tower weight is 364 kg, corresponding to the 6 mm wall thickness configuration. Under 0.4 kN/m² conventional wind pressure, GH-3 provides additional safety margin through higher structural redundancy; under 0.7 kN/m² high wind pressure, GH-3 is the preferred configuration in this group that can be adapted without separate structural re-verification. Top diameter 190 mm, base plate diameter 362 mm. The foundation is JD-1 independent footing with M24×8 anchor bolts, requiring minimal civil excavation. The tower top can accommodate Jielitong active pre-discharge air terminals and mechanical lightning counters. This model is suitable for rooftops, small warehouses, pump rooms, communication base stations, and conventional lightning protection scenarios with higher requirements for structural redundancy.
二、执行规范标准
- Applicable Codes and Standards
GB 50057-2010《建筑物防雷设计规范》
GB 50057-2010 Code for Design Protection of Structures Against Lightning
GB 50135-2019《高耸结构设计标准》
GB 50135-2019 Standard for Design of High-Rising Structures
GB 50009-2012《建筑结构荷载规范》
GB 50009-2012 Load Code for the Design of Building Structures
GB 50011-2010(2016版)《建筑抗震设计规范》
GB 50011-2010 (2016 Edition) Code for Seismic Design of Buildings
GB/T 13912-2002《金属覆盖层 钢铁制件热浸镀锌层技术要求及试验方法》
GB/T 13912-2002 Metallic Coatings—Hot Dip Galvanized Coatings on Fabricated Iron and Steel Articles—Specifications and Test Methods
CECS 80:2006《塔桅钢结构工程施工质量验收规程》 (垂直度验收依据,第9.6.2条整体垂直度、第9.6.3条节间垂直度)
CECS 80:2006 Specification for Construction Quality Acceptance of Tower and Mast Steel Structures (Basis for verticality acceptance, Article 9.6.2 overall verticality, Article 9.6.3 section verticality)
15D501《建筑物防雷设施安装》国家建筑标准设计图集
15D501 Installation of Lightning Protection Facilities for Buildings, National Building Standard Design Atlas
IEC 62305《雷电防护》国际标准
IEC 62305 Protection against Lightning - International Standard
三、塔体核心技术参数(多源交叉验证)
- Core Technical Parameters of Tower Body (Multi-source Cross-verified)
塔型:GH单管锥形钢管避雷塔(塔体兼作引下线),总高度 11m。
Tower type: GH single-pipe tapered steel tube lightning tower (tower body serves as down conductor), total height 11m.
主材材质:Q235B碳素结构钢;锥形钢管整体热浸镀锌,锌层厚度 ≥85μm(符合GB/T 13912),满足户外长期防腐需求。-6
Main material: Q235B carbon structural steel; tapered steel pipe integrally hot-dip galvanized, zinc coating thickness ≥85μm (per GB/T 13912), meeting long-term outdoor anti-corrosion requirements.-6
截面与壁厚:锥形截面,上口直径 190mm,底盘直径 362mm。壁厚 6mm(GH-3在该组中对应重载配置;5mm配置对应305kg级,6mm配置对应364kg级)。
Section and wall thickness: tapered section, top diameter 190mm, base plate diameter 362mm. Wall thickness 6mm (GH-3 corresponds to the heavy-duty configuration in this group; the 5mm configuration corresponds to the 305kg class, and the 6mm configuration corresponds to the 364kg class).
重量:364 kg(6mm壁厚配置,塔体参考重量,不含基础及附件)。
Weight: 364 kg (6mm wall configuration, reference tower weight excluding foundation and accessories).
设计基本风压:0.4 / 0.7 kN/m² 均适用(11米高度、GH-1~4组在选型表中对两档风压均标注适用)。GH-3的364kg重载配置为0.7 kN/m²工况提供了直接适配的结构基础。-1
Basic design wind pressure: 0.4 / 0.7 kN/m² both applicable (the 11-meter height, GH-1~4 group is marked as applicable to both wind pressure tiers in the selection table). GH-3's 364kg heavy-duty configuration provides the structural basis for direct adaptation to 0.7 kN/m² conditions.-1
地基承载特征值:≥100 kN/m²(JD-1基础按100 kN/m²档位配置;150 kN/m²档位亦在适用范围内,可根据地勘优化基础配筋)。-1
Characteristic value of foundation bearing capacity: ≥100 kN/m² (JD-1 foundation configured for the 100 kN/m² tier; the 150 kN/m² tier is also applicable, allowing foundation reinforcement optimization based on geotechnical survey).-1
配套基础:JD-1 现浇混凝土独立基础。基础尺寸 a=650mm,b=800mm,埋深 2.0m,基础体积 0.845m³。预埋螺栓 M24×8。基础顶面荷载标准值:Mk=12.106 kN·m,Nk=4.939 kN,Qk=2.611 kN。基础混凝土选配 C20,垫层 C10。(注:部分厂家资料建议不低于C25,本文件以图集原注C20为基准;实际项目可根据地勘与设计院要求提高等级。)-1
Supporting foundation: JD-1 cast-in-place concrete isolated foundation. Dimensions a=650mm, b=800mm, embedment depth 2.0m, volume 0.845m³. Anchor bolts M24×8. Foundation top load standard values: Mk=12.106 kN·m, Nk=4.939 kN, Qk=2.611 kN. Foundation concrete C20, blinding C10. (Note: some manufacturer data suggest not lower than C25; this document uses the atlas original note of C20 as the baseline. Actual projects may increase the grade based on geotechnical survey and design institute requirements.)-1
防腐方式:整体热浸镀锌,锌层厚度 ≥85μm。在标准工业大气及一般户外环境中,满足25年以上防腐需求。
Anti-corrosion method: integrally hot-dip galvanized, zinc coating thickness ≥85μm. In standard industrial atmospheres and general outdoor environments, it meets anti-corrosion requirements of more than 25 years.
垂直度控制:
整体垂直度:≤H/1500(即≤7.3mm) ,依据 CECS 80:2006第9.6.2条。
节间垂直度(若采用分段节段):≤h/750,依据 CECS 80:2006第9.6.3条。
Verticality control:
Overall verticality: ≤H/1500 (i.e., ≤7.3mm), per Article 9.6.2 of CECS 80:2006.
Section verticality (if segmented sections are used): ≤h/750, per Article 9.6.3 of CECS 80:2006.
使用寿命:正常户外环境(热镀锌层完好、无强腐蚀介质)设计使用年限 ≥25年。
Service life: design service life ≥25 years under normal outdoor environment (intact galvanized coating, no highly corrosive media).
四、全套防雷配套产品清单(含精准数量)
4. Jielitong Complete Lightning Protection Accessory Product List (with Precise Quantities)
说明:以下数量为基于常规土壤(土壤电阻率≤300Ω·m)的标准配置参考。实际工程中应根据现场实测土壤电阻率及地勘报告,由技术团队出具定制化接地配置方案。
Note: The following quantities are a reference standard configuration based on conventional soil (soil resistivity ≤ 300Ω·m). In actual projects, Jielitong's technical team should issue a customized grounding configuration scheme based on the measured on-site soil resistivity and geotechnical report.
(一)接闪与引下部分
(1) Air Termination and Down-Conductor Part
主动预放电避雷针(ESE) :1套。安装于塔顶。其保护半径的提升源于提前上行先导特性,按NF C 17-102标准计算;该性能描述不作为GB 50057滚球法设计的强制依据,但能为楼顶、小型库房等有限空间提供更大的防雷安全裕度。
Active pre-discharge air terminal (ESE): 1 set. Installed at the tower top. The protection radius enhancement originates from the early upward leader characteristic, calculated per NF C 17-102; this performance description is not a mandatory basis for rolling-sphere design under GB 50057 but provides a larger lightning protection safety margin for rooftops and small warehouses with limited space.
利用塔体本体作为引下线:GH-3的钢管塔体本身即为引下通路,无需额外敷设专用引下线。节段连接处(法兰或插接)须保证可靠电气连通(跨接或接触电阻≤0.03Ω)。
Tower body as down conductor: The steel pipe body of GH-3 serves as the down-conductor path; no separate dedicated down conductor is required. Section connections (flange or plug-in) must ensure reliable electrical continuity (bonding or contact resistance ≤0.03Ω).
断接卡(测试点) :1套。安装于距地面1.5m~1.8m处,便于防雷年检时断开测量接地电阻。
Disconnect clamp (test point): 1 set. Installed at 1.5m~1.8m above ground for convenient disconnection and grounding resistance measurement during annual lightning protection inspections.
(二)智能监测部分(可选配)
(2) Intelligent Monitoring Part (Optional)
机械式雷电计数器:1台。安装于断接卡上方直线段,感应并记录雷击次数,无需外部供电。
Mechanical lightning counter: 1 unit. Installed on the straight section above the disconnect clamp to sense and record lightning strikes without external power supply.
(三)特种接地系统部分(防雷验收的核心)
(3) Special Grounding System Part (Core of Lightning Protection Acceptance)
水平接地干线:25m。采用 -40×4热镀锌扁钢,围绕JD-1基础外围敷设,形成环形地网。
Horizontal grounding main: 25m. Made of -40×4 hot-dip galvanized flat steel, laid around the periphery of the JD-1 foundation to form a ring grounding grid.
空腹式离子接地极:2根。每根长3m,在基础两侧对称布置,垂直打入地下。
Jielitong hollow ion grounding electrodes: 2 rods. Each is 3m long, symmetrically arranged on both sides of the foundation and driven vertically into the ground.
零欧复合接地体:2套。配合离子接地极使用,增大散流面积。
Zero-ohm composite grounding bodies: 2 sets. Used together with ion grounding electrodes to increase current-dissipation area.
高纯物理降阻剂:100kg。回填接地沟槽,确保系统达标。
High-purity physical resistance-reducing agent: 100kg. Used for backfilling grounding trenches to ensure compliance.
等电位连接排:1块。镀锡铜排,安装于塔脚或设备机架,用于设备接地汇集。
Equipotential bonding bar: 1 piece. Tin-plated copper bar, installed at the tower foot or equipment rack for equipment grounding convergence.
接地电阻目标:依据GB 50057-2010第4.2.1条第8款,独立接闪杆每一引下线的 冲击接地电阻不宜大于10Ω。实际工频电阻需按GB 50057-2010附录C换算后判定。配置方案以保障冲击接地电阻≤10Ω为验收目标。
Grounding resistance target: Per Article 4.2.1, Clause 8 of GB 50057-2010, the impulse grounding resistance of each down conductor of an independent air terminal should not exceed 10Ω. Measured power-frequency resistance shall be converted per Appendix C of GB 50057-2010 before judgment. Jielitong's configuration targets impulse grounding resistance ≤ 10Ω for acceptance.
五、GH-3型产品核心特点
- Core Product Features of GH-3
11米段中的“重载冗余”选项,0.4风压下的额外安全裕度:GH-1/GH-2以305kg的5mm壁厚覆盖0.4 kN/m²常规风压,GH-3则以364kg的6mm壁厚在同一高度上提供更高的结构冗余。对于楼顶设备密集、后期可能增加挂载、或对长期风振疲劳有更高要求的项目,GH-3在不改变基础形式和安装方式的前提下,给出了“加几十公斤钢,换更大安全裕度”的清晰选项。
The “heavy-duty redundancy” option in the 11-meter segment, extra safety margin under 0.4 wind pressure: GH-1/GH-2 cover 0.4 kN/m² conventional wind pressure with 305kg at 5mm wall thickness, while GH-3 provides higher structural redundancy at the same height with 364kg at 6mm wall thickness. For projects with dense rooftop equipment, potential future additional mounting, or higher requirements for long-term wind-induced fatigue, GH-3 offers a clear option of “adding tens of kilograms of steel for greater safety margin” without changing the foundation form or installation method.
0.7 kN/m²工况的直接适配配置,无需另行结构复核:在11米、GH-1~4组中,0.7 kN/m²高风压场景若选用5mm/305kg配置,通常需对杆体及基础进行复核。GH-3作为该组的6mm/364kg重载配置,为0.7 kN/m²工况提供了图集体系内直接适配的现成选项,设计选型时无需在“选轻了不放心”和“重新算一遍”之间纠结。-1
Directly adaptable configuration for 0.7 kN/m² conditions, no separate structural re-verification required: In the 11-meter, GH-1~4 group, selecting the 5mm/305kg configuration for 0.7 kN/m² high wind pressure typically requires verification of the pole body and foundation. GH-3, as the 6mm/364kg heavy-duty configuration in this group, provides an off-the-shelf option within the atlas system that is directly adaptable to 0.7 kN/m² conditions, eliminating the dilemma of “choosing too light is unsafe” versus “recalculating everything” during design selection.-1
与GH-1/GH-2共享JD-1基础,选型切换零土建代价:GH-3与GH-1/GH-2同属11米、GH-1~4组,配套基础均为 JD-1(650×800mm,埋深2.0m,0.845m³,M24×8)。从GH-2升级到GH-3,设计院无需调整基础图纸,施工单位无需改变基坑方案,仅塔体杆段规格变化。这种“同基础、可升级”的选型弹性,在项目前期风压参数尚未最终锁定或后期荷载可能变化时,具有实际的工程管理价值。-1
Shares JD-1 foundation with GH-1/GH-2, zero civil engineering cost for selection switching: GH-3 belongs to the same 11-meter, GH-1~4 group as GH-1/GH-2, and the supporting foundation is JD-1 (650×800mm, 2.0m embedment, 0.845m³, M24×8). Upgrading from GH-2 to GH-3 requires no adjustment of foundation drawings by the design institute and no change in foundation pit scheme by the construction unit; only the tower body section specifications change. This selection flexibility of “same foundation, upgradeable” has practical engineering management value when project wind pressure parameters are not yet finalized or later loads may change.-1
单管塔垂直度按CECS 80双条款验收,整体与节间均有据:GH-3作为单管塔,整体垂直度依据 CECS 80:2006第9.6.2条(≤H/1500,11米对应≤7.3mm) ;若采用分段节段,节间垂直度依据 第9.6.3条(≤h/750) 。两条专项条款并列,验收口径清晰,无需借用塔架通用条款。
Single-pipe tower verticality accepted per dual CECS 80 clauses, with basis for both overall and section: As a single-pipe tower, GH-3's overall verticality is based on Article 9.6.2 of CECS 80:2006 (≤H/1500, ≤7.3mm for 11m) ; if segmented sections are used, section verticality is based on Article 9.6.3 (≤h/750) . The two dedicated clauses stand side by side, providing a clear acceptance criterion without resorting to general tower-frame provisions.
六、GH-3型适用应用场景
- Application Scenarios of GH-3
楼顶设备密集或后期可能扩容的防雷点位:写字楼、医院、学校楼顶的空调机组、通信天线、监控设备群。GH-3的364kg重载杆体为后期增加挂载或应对长期风振提供了比GH-2更大的裕度,同时底盘362mm和JD-1基础完全不变,屋面荷载与安装条件不因升级而复杂化。
Rooftop lightning protection points with dense equipment or potential future expansion: Rooftop air-conditioning units, communication antennas, and monitoring equipment clusters on office buildings, hospitals, and schools. GH-3's 364kg heavy-duty pole body provides greater margin than GH-2 for future additional mounting or long-term wind-induced vibration, while the 362mm base plate and JD-1 foundation remain completely unchanged, so roof loads and installation conditions do not become more complex due to the upgrade.
0.7 kN/m²风压区的11米级通信基站或小型库房:沿海或强风口区域的小型基站、危险品库房、加油站辅助用房,需要11米高度且风压等级较高。GH-3作为该组中6mm/364kg配置,是图集体系内直接适配0.7 kN/m²的现成选择,无需另行杆体复核。
11-meter communication base stations or small warehouses in 0.7 kN/m² wind pressure areas: Small base stations, hazardous goods warehouses, and auxiliary buildings of gas stations in coastal or strong-wind areas requiring 11-meter height and higher wind pressure grades. GH-3, as the 6mm/364kg configuration in this group, is an off-the-shelf choice directly adaptable to 0.7 kN/m² within the atlas system, without separate pole body verification.
对风振疲劳寿命有较高要求的工业辅助设施:工厂车间旁、管廊附近、围墙边角的高耸防雷点位,长期受设备振动或阵风交替作用。GH-3较厚的管壁在抗风振疲劳方面具有材料层面的天然优势,且单管结构无螺栓桁架节点,不存在节点松动带来的疲劳裂纹萌生点。
Industrial auxiliary facilities with higher requirements for wind-induced fatigue life: Tall lightning protection points beside factory workshops, near pipe racks, or at wall corners, subject to long-term equipment vibration or alternating gusts. GH-3's thicker pipe wall has a natural material-level advantage in wind-induced fatigue resistance, and the single-pipe structure has no bolted truss nodes, eliminating the fatigue crack initiation points associated with node loosening.
设计前期风压参数待定、需要预留升级弹性的项目:部分项目在初步设计阶段风压参数或后期荷载尚未最终锁定,GH-3与GH-1/GH-2共享JD-1基础,可先按统一基础出图,待参数确认后仅调整塔体规格,避免基础返工。
Projects with undetermined wind pressure parameters in early design stages requiring reserved upgrade flexibility: In some projects, wind pressure parameters or later loads are not finalized during preliminary design. GH-3 shares the JD-1 foundation with GH-1/GH-2, allowing unified foundation drawings first, with only tower body specifications adjusted after parameters are confirmed, avoiding foundation rework.
七、验收与运维说明
- Acceptance and O&M Instructions
安装验收:核对地勘报告,确认地基承载力特征值满足 ≥100 kN/m²。单管塔整体垂直度偏差 ≤H/1500(≤7.3mm)(CECS 80:2006第9.6.2条);若采用分段节段,节间垂直度 ≤h/750(第9.6.3条)。M24×8地脚螺栓须按力矩要求复紧。节段连接处(法兰或插接)须检查电气连通性,确保塔体作为引下线的连续性。接地系统完工后实测工频电阻并按GB 50057附录C换算,以 冲击接地电阻≤10Ω 为合格判定口径。
Installation acceptance: Check the geotechnical report to confirm foundation bearing capacity ≥100 kN/m². Single-pipe tower overall verticality deviation ≤H/1500 (≤7.3mm) (CECS 80:2006 Article 9.6.2); if segmented sections are used, section verticality ≤h/750 (Article 9.6.3). M24×8 anchor bolts shall be re-tightened to torque requirements. Section connections (flange or plug-in) shall be checked for electrical continuity to ensure the tower body functions as a continuous down conductor. After grounding system completion, measure power-frequency resistance, convert per Appendix C of GB 50057, and use impulse grounding resistance ≤10Ω as the qualified criterion.
定期巡检:每年雷雨季前检查底盘法兰及节段连接处的螺栓/插接件有无松动、锈蚀,跨接导体是否完好。由于无专用引下线,重点检查杆体节段接续处的电气连通性(可抽测接触电阻)。检查断接卡是否可正常断开。台风或大风过后检查基础周边有无冲刷或积水。
Periodic inspection: Before each thunderstorm season, check base and section connection bolts/plug-in components for loosening and corrosion, and verify bonding conductors are intact. Since there is no dedicated down conductor, focus on the electrical continuity at pole body section joints (spot-check contact resistance). Check that the disconnect clamp can be properly opened. After typhoons or strong winds, check foundation surroundings for scour or water accumulation.
防腐修补:若镀锌层有磕碰脱落,用 富锌底漆(干膜含锌量≥80%) 补涂两道。锥形钢管底部接近地面区域为腐蚀敏感区,沿海或工业大气项目中建议每5年对该区域进行面漆维护。
Anti-corrosion repair: If the galvanized coating is knocked off, apply two coats of zinc-rich primer (zinc content in dry film ≥80%). The lower portion of the tapered steel pipe near ground level is a corrosion-sensitive zone; for coastal or industrial atmosphere projects, topcoat maintenance of this zone every 5 years is recommended.
智能监测运维:选配的雷电计数器支持长期免维护运行,数据可人工读取或通过物联网模块接入运维平台。
Intelligent monitoring O&M: The optional lightning counter supports long-term maintenance-free operation; data can be read manually or connected to the Jielitong O&M platform via IoT modules.